Letter from JJ Rhatigan - Paul Fitzmaurice
Development Manager to PF Chairman Michael Goss.
Following our recent discussion, I can confirm that Eircom are proposing to proceed with the upgrade of their network to allow for Next Generation (Fibre) Broadband access for all houses in Palace Fields.
They are proposing to commence works on site next week and have assured us that there will be minimum disruption caused during the course of the works. They will have to put a cable under the road at 2 points in the estate and the road will be reinstated to the same condition in which it was before the works. There will be traffic management in place throughout the course of the works and the traffic flow through the estate will not be interrupted at any point.
They will also be installing a meter cabinet to allow for the operation of the Next Generation (Fibre) Broadband Network.
Development Manager to PF Chairman Michael Goss.
Following our recent discussion, I can confirm that Eircom are proposing to proceed with the upgrade of their network to allow for Next Generation (Fibre) Broadband access for all houses in Palace Fields.
They are proposing to commence works on site next week and have assured us that there will be minimum disruption caused during the course of the works. They will have to put a cable under the road at 2 points in the estate and the road will be reinstated to the same condition in which it was before the works. There will be traffic management in place throughout the course of the works and the traffic flow through the estate will not be interrupted at any point.
They will also be installing a meter cabinet to allow for the operation of the Next Generation (Fibre) Broadband Network.